Gladstone Area Water Board has proposed the extension of the existing raw water supply system into the Fisherman’s Landing Reclamation Area behind the existing Fisherman’s Landing berths, to provide a water supply to a proposed construction facility.
This project is for the installation, testing and commissioning of;
- 1400m of OD 450 HDPE PN 16 pipeline
- 1350 m of OD 315 HDPE Pn 16 above ground temporary pipeline
- 600m of OD 315mm HDPE PN 16 Pipeline
- Thrust boring, commissioning, testing and installation of inline fittings
The project was finished in September 2011 without any incidents, in challenging ground conditions and under critical time pressures.
« Dohles Rocks Road Sewer Rising Main | Murrumbidgee to Googong M2G Pipeline Package »
Client: Gladstone Area Water Board